Lowest upkeep

Composite Deck Installer for DuPage County and the NW Suburbs

Looking for a composite deck installer in the northwest suburbs? We fit Trex, TimberTech, AZEK, Fiberon and Deckorators, over a frame built to outlast the boards.

5.0 from 53 Google reviews Licensed, bonded & insured Our own crew, never subcontracted

No obligation and no pressure. We walk the yard, talk through options, and give you a written price.

Tan composite deck boards with white railing posts and black balusters, lit by low evening sun

Quick answer

Capped composite runs $55 to $80 per square foot installed and carries a 25 to 50 year warranty. Washing is the upkeep. Pressure-treated costs less at $30 to $45, but it wants a clean and re-coat every 2 to 4 years. We install Trex, TimberTech, AZEK, Fiberon and Deckorators. Get a free estimate.

Why homeowners here keep choosing composite

No staining, ever

Capped composite has a hard shell bonded to the outside. Rain, sun and snow do not soak in, so your yearly maintenance is soap, water and a brush.

25 to 50 year warranties

Every major brand we install backs its boards with a long fade, stain and structural warranty. Read as a cost per year, composite usually wins over the life of the deck.

Built for Illinois winters

Composite does not splinter, cup or check the way wood does after a freeze and thaw cycle. It looks the same in year ten as it does in year two.

What you should know before you pick a composite deck

Wide grey composite deck with black aluminum railings and a covered hot tub in the corner

Capped composite versus PVC, in plain language

Capped composite is a wood-flour and plastic core with a hard polymer shell. It feels solid underfoot and carries the widest range of colors and grain patterns.

PVC has no wood in it at all. It weighs less, stays cooler in direct sun and costs more. Azek is the PVC line most people around here have heard of.

Both are low maintenance. If your deck bakes in full afternoon sun with no shade, PVC is worth the conversation. Otherwise capped composite is the value pick.

Brown composite deck with white railings, a covered gas grill and patio furniture

The brands we install, and which one fits

We are not tied to one manufacturer, so we can put the right board on your deck instead of the one we are required to sell. Each of these has its own page with the lines, warranty and trade-offs spelled out.

  • Trex is the name most people know. Best value into real capped composite, and the phrase buyers recognize on a listing.
  • TimberTech runs cooler than most composite and carries the longest warranties in the category.
  • AZEK is TimberTech's all-PVC line. The coolest board underfoot and the top of the range.
  • Fiberon gives you a premium look at a mid-range price.
  • Deckorators builds around traction, which makes it the pick for poolside and anywhere that stays wet.

We do not hold a manufacturer tier and we will not claim one. What we bring is 20 years of putting these boards down correctly in this climate. For a head to head, read Trex vs TimberTech or the 2026 brand roundup.

Pressure-treated deck framing and joists going in over a sloped yard before decking is installed

A composite deck is only as good as the frame under it

This is where cheap composite decks go wrong. Composite boards need tighter joist spacing than wood, and they telegraph every dip in a sloppy frame.

We frame in pressure-treated lumber to the spacing the manufacturer specifies, not the spacing that saves us an hour. Get the frame wrong and a 50 year board sits on a 10 year structure.

Not sure composite is right for the budget? Compare it honestly against cedar and pressure-treated before you decide.

How a composite deck build runs

01

Free on-site estimate

We measure, look at sun exposure and sight lines, and bring real board samples so you can see color in your own light. Screens lie about color.

02

Pick your board and railing

You choose the brand, color and railing system. We give you the honest cost difference between lines instead of steering you to whatever we have most of.

03

Permit, footings and frame

We file with your village, dig to code depth and build the pressure-treated frame at the joist spacing your chosen board requires.

04

Boards, trim and walkthrough

Hidden fasteners where the system uses them, fascia and trim to finish the edges, then a full site clean and a walkthrough with you.

Composite Decking Installation across DuPage County and the northwest suburbs

We're based in Roselle and build in these towns every week.

Decks we have rebuilt

Drag the handle to see what these looked like before we started. Same crew, same standard, whichever service you need.

Before After An old wood deck before RR rebuilt it The same deck after RR rebuilt it

A tired stained-wood deck torn out and rebuilt in warm composite with black aluminum railings and angled corners.

Before After Old wood deck in Hoffman Estates, Illinois before RR rebuilt it The same Hoffman Estates deck after RR rebuilt it

Hoffman Estates, IL. A weathered raised deck rebuilt with composite decking and modern black railings.

See every project in the full gallery

Composite decking questions

How much does a composite deck cost?

Composite decks in the northwest suburbs typically run higher than wood up front and lower over the life of the deck. Board choice, size, height and railing system drive the number. Most of our composite builds land in the middle to upper part of the $8,000 to $40,000 range. That is a typical range and not a quote. See our deck cost guide for a breakdown.

Does composite decking get hot in the sun?

Darker boards get hot in direct summer sun, the same as any dark surface. Lighter colors and PVC lines like Azek run noticeably cooler. If your deck faces west with no shade, we will steer you toward a lighter board.

Is composite decking really maintenance free?

No, and anyone who says so is overselling it. Composite is low maintenance, not maintenance free. You still wash it, and you still clear leaves and standing debris. What you do not do is sand, stain or seal it.

How long does composite decking last?

Manufacturers warranty most capped composite for 25 to 50 years against fading, staining and structural failure. Real-world life depends heavily on the frame underneath, which is why we build the structure in pressure-treated lumber to the manufacturer's joist spacing.

Can I put composite boards on my existing deck frame?

Sometimes, and it is worth checking. If the frame is sound and the joist spacing works, re-decking costs meaningfully less than a full rebuild. We inspect the structure and tell you honestly. Read more about re-decking.

Do you install Trex, TimberTech and Azek?

Yes. We install Trex, TimberTech, Azek, Fiberon and Deckorators. We are not locked into one brand, so we can match the board to your budget and your sun exposure rather than to a supplier agreement.

Get a price on your composite deck

We bring real board samples to the estimate so you can see the color in your own yard. Free, on site, and no pressure.